Hydraulic Base Mounted Pile hammer
BASE MOUNTED PILE HAMMER
The EXCAVATOR MOUNTED PILING RIG with completely original concept in Excavator Mounted Piling Rig equipment industries has been manufactured by BRUCE of one of the world leading supplier of hydraulic pile hammer.
It is a multi-purpose rig designed for piling works in confined area.
The BRUCE compact and unique design allows for easy transportation and storage.
It can be customer friendly according to user own Excavator model and sizes.
Remote Control Box for BRUCE Hydraulic Pile Hammer is in the cabin of Piling Rig to operate BRUCE Hydraulic Pile Hammer easily !!
Most efficient way an accurate project Cost effective outcome for the budget Suits for micro and big scaled foundation
Fits for all different types of tool carrier Driving steel, concrete, timber piles Driving and extracting with vibrator
Attached to the existing excavator Design makes it ideal for limited access Leader provide to climb for maintenance This system fit on bucket cylinder Easy to change to bucket to use
Visual check leader with high versatility and center of gravity Versatility of different types of tool carrier, hammer & vibrator Easy installation and quick changeable piling rig attachment The ideal design of leader for unlimited access to sites.
The size of length leader can be set upon request Remote Control Box and Manifold Block for easy adjustment Convenient setting up and easy disassembling the equipment
OUTSTANDING FEATURES OF BASE MOUNT HAMMER
With the help of efficient design of pile hammer body and the cushion arrangement, impact energy from ram drop can be transferred to pile head with lower energy loss. That means the job efficiency can be maximized
Compensation of energy drop efficiency during ram drop is functioning by equipped accumulator back charging system to cylinder.
The well-built structure of hammer cap housing and optimum choice of cushion material ensure longer term use of cushion parts.
Therefore customers can achieve the economical operation with lower running cost.
As Bruce hammer choose only quality improved supplier of consumable parts, long life time of the parts is guaranteed.
Therefore customer can save the cost from consumable parts.
BRUCE casing pile clamps available with 45 ~280 tons of clamping force for special requirements of pile driving.
Clamping force is designed from 45 tons to 280 tons for casing piles of our model however, we can also supply more smaller or bigger clamps upon customer request.
To meet the demand for precise piling nowadays, Bruce piling hammer provides energy monitoring system as an optional kit, which enables continuous record of each blow energy on real time basis.
Hard print and PC link are available for recording and further analysis..
Bruce hydraulic pile hammers are designed and manufactured for long life service with minimal downtime. For the purpose,
accurate and precise workmanship is adopted to electric and hydraulic system ensuring low downtime on both systems and promoted endurance with hoses, cables, couplings and other related parts.
Ram drop height indicator on the side of the hammer is standard equipped with height marking so that operator can see ram drop height easily during pile driving and can adjust ram height stroke during pile driving through remote control box provided